Solar PV

Doxford Solar Office, 1998

Location:
Solar Office Doxford International, Doxford Park, Sunderland, UK
System Cost:
The cost of delivering the shell-and-core building was made up as follows: * Building construction: GBP 3 514 000 (€ 5 658 600) * Landscape and infrastructure: GBP 365 000 (€ 587 800) * Professional fees and other charges: GBP 346 000 (€ 557 100) Total: GBP 4 225 000 (€ 6 803 500) The costs of the fit-out was as follows: * Fit-out: GBP 600 000 (€ 966 200) * Professional fees and other charges: GBP 54 000 (€ 87 000) Total: GBP 654 000 (€ 1 053 200) [€ 1 = GBP 0,621]
System Size:
73 kWp System characteristics * PV system power: 73 kW utility-interactive * Type of building integration: building façade * Type of cell technology: Mono-crystalline square cells * Module dimensions: 70 Wp – 285 Wp (350) polycrystalline silicon, Manufacturer: Kyocera * Inverters: Central inverters 35 kW (2)
Output:
55,000 kWh per year

Building Integrated Owned by Akeler Developments Ltd

Between 25% and 33% of the electrical power requirements will be provided by the 646 m2, 73,1 kWp PV array which is integrated to the building's angular, inclined south façade

For further info go to the PV North East weblink on the North East links page

Close This Window

Main Panel
Region Map
Solar PV
Projects in Tyne and Wear
ViewHideList
Wind
Wind
Wind
View/HideList
Solar PV
Solar PV
Solar PV
View/HideList
Solar Thermal
Solar Thermal
Solar Thermal
Geothermal
Geothermal
Geothermal
Hydro
Hydro
Hydro
Biomass
Biomass
Biomass
Hydrogen
Hydrogen
Hydrogen
Wave and Tidal
Wave and Tidal
Wave and Tidal
Other
Other
Other
Newcastle Upon Tyne North Tyneside South Tyneside Sunderland Gateshead